Air Tightness Testing for Building Regulations — UK

🌪️ ATTMA Certified Testing

Air Tightness Test Failing? We Fix It.

Don't let a failed test delay your completion certificate. Our ATTMA-certified engineers provide expert testing plus remedial advice to get you over the line.

ATTMA certified engineers with proven track record
Remedial support including leak detection and solutions
Fast turnaround certificates within 48 hours

💰 From £350 • ⏱️ 2-4 hours on site • 🔧 Remedial advice included

Air tightness testing equipment and ATTMA certification process
92%
First-time pass rate

When Air Tightness Testing Is Required

Air tightness testing is mandatory for most new buildings and extensions under Approved Document Part L of the Building Regulations. The test measures how much uncontrolled air leakage occurs through the building fabric.

  • New dwellings and residential buildings
  • Non-domestic buildings over 500m²
  • Extensions and conversions where SAP calculations are required
  • Buildings following certain compliance routes under Part L

Standards & Methods — ATTMA & Part L Requirements

Testing follows ATTMA Technical Standards and Building Regulations requirements:

  • ATTMA TSL1 for domestic buildings
  • ATTMA TSL2 for non-domestic buildings
  • BS EN ISO 9972 international standard
  • Part L1A/L1B and L2A/L2B compliance paths

Test Process & Equipment

Pre-Test Preparation

  • Building readiness inspection
  • Sealing of intentional openings
  • Photography of test setup
  • Weather condition assessment

Testing Procedure

  • Blower door fan installation
  • Pressurisation and depressurisation tests
  • Multiple pressure measurements
  • Leakage rate calculations

Results & Certification

  • Air permeability calculation
  • Compliance assessment
  • ATTMA certificate issued
  • Remedial advice if required

Pass/Fail Criteria & Results

Target Performance Rates

≤10 m³/(h.m²)
Domestic buildings @ 50Pa
Variable rates
Non-domestic by building type

Test Outcomes

Pass
ATTMA certificate issued
Fail
Remedial work & retest needed

Timeline & Coordination

Testing must be coordinated with construction programme and Building Control inspections:

  • Book test 2-3 weeks in advance
  • Building must be substantially complete
  • Test typically takes 2-4 hours on site
  • Certificate issued within 5 working days
  • Coordinate with final Building Control inspection

Common Failure Points & Prevention

Typical Air Leakage Paths

  • Service penetrations through walls/floors
  • Window and door reveals
  • Junction between different building elements
  • Incomplete vapour barriers

Prevention Strategies

  • Continuous air barrier design
  • Proper sealing of penetrations
  • Quality control during construction
  • Pre-completion air tightness checks

Fees & Turnaround

Pricing depends on building size, location, and complexity:

  • Single dwelling: £350-£600
  • Multi-unit residential: £400-£800 per test
  • Non-domestic: £500-£1,200+ depending on size
  • Retest (if required): typically 50% discount
  • Travel and accommodation may apply for distant locations

FAQs — Air Tightness Testing

When should I book the test?

Book 2-3 weeks in advance once the building is substantially complete but before final finishes.

What happens if my building fails?

We identify leakage areas, provide a remedial report, and offer discounted retesting once improvements are made.

Do I need design air permeability calculations?

Yes, these are typically required as part of SAP calculations and must be available before testing.

Can testing be done in winter?

Yes, but extreme weather conditions may affect scheduling. Indoor/outdoor temperature difference should be considered.

Need Air Tightness Testing That Passes?

Our ATTMA-certified team doesn't just test – we help you pass. With expert remedial advice and proven success rates, get your completion certificate without delays.

92%
First-time pass rate
48hrs
Certificate delivery
£350+
Starting price

🌪️ ATTMA certified • 🔧 Remedial advice • ⚡ Nationwide coverage